
_____ Unit construction costs with Open Shop and Union installation costs (on the same page), plus material cost and man-hours. 13,000 line items arranged in 16 Division format. Also includes 2,800 line items of Assembly Costs, Square Foot Building Costs, location factors, and indexes. A CD-ROM with an estimating program including two databases (Union & Open Shop) and the Assemblies is part of the package. A reliable and convenient estimating tool for bid preparation & analysis.
Page Count:
0
Publication Date:
2002-01-01
No comments yet. Be the first to share your thoughts!